Zodiac Gold

East Africa Metals Completes Mato Bula Infill Drill Program; Intersects 12.60 Metres Grading 12.59 g/t Gold, 0.66% Copper and 1.5 g/t Silver

VANCOUVER, BC--(Marketwired - May 29, 2017) - East Africa Metals Inc.(TSX VENTURE: EAM) ("East Africa" or the "Company") is pleased to announce newly received results from recently completed infill diamond drilling at the Adyabo Project, Mato Bula deposit in Ethiopia.

Highlight intersections include:

  • At Mato Bula - 12.60 metres grading 12.59 grams per tonne gold, 0.66% copper, and 1.5 grams per tonne silver, from 77.40 metres drill depth (WMD085), and;
  • At Mato Bula - 7.60 metres grading 14.59 grams per tonne gold, 0.62% copper, and 1.5 grams per tonne silver, from 150.40 metres drill depth (WMD086).

Adyabo Project Mato Bula work program

The Mato Bula infill diamond drill program was concluded on May 15, 2017. A total of 7,025 metres in 49 holes were completed. Geophysical I.P. survey work continues on site, and is expected to be completed in early June 2017. The most recent drill results received are outlined below.

Mato Bula infill diamond drill intercepts

Hole ID   From (m) To (m) Interval (m) 1 Gold          g/t2,3 Copper      % Silver        g/t Zinc              % Local Azimuth Dip Prospect
WMD076   16.24 19.00 2.76 5.13 0.04 1.7 0.01 270 -45 Mato Bula
  40.01 46.00 5.99 2.29 0.26 8.0 0.30
WMD077   30.00 36.00 6.00 1.36 0.55 1.2 0.02 270 -69 Mato Bula
  63.80 67.00 3.20 0.92 0.21 4.1 1.11
  71.80 93.00 21.2^^ 0.28 0.23 4.7 1.02
including 88.00 93.00 5.00 0.47 0.32 6.3 0.57
WMD078   40.23 41.00 0.77 1.90 0.14 0.0 0.01 270 -49 Mato Bula
  143.26 147.00 3.74 4.22 1.13 1.2 0.00
  151.30 154.90 3.60 0.51 1.70 2.6 0.00
  228.00 232.73 4.73^^ 0.25 0.28 6.8 1.57
WMD079   34.30 40.64 6.34 0.54 0.01 1.7 0.00 270 -45 Mato Bula
  50.00 53.80 3.80 4.84 0.52 5.9 0.06
WMD080   105.00 110.00 5.00 0.61 0.90 1.8 0.00 270 -63 Mato Bula
  129.00 135.00 6.00 5.39 0.06 1.1 0.00
including 133.00 135.00 2.00 14.95 0.06 2.0 0.00
WMD081   22.86 25.91 3.05 2.24 0.00 0.2 0.00 270 -47 Mato Bula
WMD082   47.00 50.00 3.00 0.81 0.93 0.6 0.00 270 -47 Mato Bula
  81.00 81.58 0.58 2.17 0.37 0.0 0.00
WMD083   214.91 218.30 3.39^^ 0.68 0.18 11.8 2.41 270 -62 Mato Bula
  216.30 220.30 4.00 0.76 0.25 11.2 0.34
WMD084   96.07 97.30 1.23 1.89 0.86 1.1 0.00 270 -49 Mato Bula
  125.00 127.00 2.00 4.25 0.21 0.0 0.00
  135.48 135.93 0.45 12.30 0.95 19.3 0.05
WMD085   77.40 90.00 12.60 12.59 0.66 1.5 0.03 270 -56 Mato Bula
  146.22 153.53 7.31 0.80 0.45 3.3 0.08
WMD086   150.40 158.00 7.60 14.59 0.62 1.5 0.03 270 -58 Mato Bula
including 153.00 155.65 2.65 37.12 1.44 3.6 0.03
WMD087   101.53 108.40 6.87 3.74 0.29 0.7 0.02 270 -48 Mato Bula
WMD088   108.70 123.00 14.30 2.39 0.26 0.6 0.01 270 -51 Mato Bula
including 108.70 115.00 6.30 4.59 0.44 1.2 0.02
  131.00 135.00 4.00 2.64 1.14 2.8 0.01

1True thicknesses are interpreted as 60-90% of stated intervals.
2No topcut has been used on analyses
3Intervals use a 0.3 gram per tonne gold cutoff value
^^Zinc interval, not subject to gold cutoff criteria

Harvest Project Update

Diamond drilling results were also received for the Lihamat drill program, as described below.

Hole ID   From (m) To (m) Interval (m) 1   Gold g/t2,3 Local Azimuth Dip Prospect
LD001   49.00 51.00 2.00   9.840 90 -59 Lihamat
LD002   35.00 36.00 1.00   4.300 90 -54 Lihamat
  61.00 62.00 1.00   4.370
LD003   No Significant Results 90 -56 Lihamat
LD004   15.50 17.00 1.50   3.300 90 -61 Lihamat

1True thicknesses are interpreted as 60-90% of stated intervals.
2No topcut has been used on analyses
3Intervals use a 0.3 gram per tonne gold cutoff value

Diagrams illustrating recent drilling results are attached and available on the website.

Lihamat Drill Collar Map
East Africa Metals 5 29 2017 1
MB Main LongSection
East Africa Metals 5 29 2017 2
Mato Bula Drill Collar Map
East Africa Metals 5 29 2017 3
Mato Bula Upper LongSection
East Africa Metals 5 29 2017 4

Quality Control

The planning, execution, and monitoring of East Africa's drilling and quality control programs at the Harvest and Adyabo Projects has been conducted under the supervision of Jeff Heidema, P.Geo., East Africa's Vice President Exploration. Mr. Heidema is a "Qualified Person" as defined by NI 43-101, and has reviewed and approved the geological information contained in this news release. Diamond drilling was coordinated by East Africa's contract geologists who also managed the preparation, logging, and sampling of core and rock samples, in addition to carrying out bulk density measurements. During sampling, quality control standards and blanks were introduced at pre-determined intervals to monitor laboratory performance. A system of field, reject, and pulp sample duplicates was also incorporated, as were specific programs of re-assaying and umpire lab assaying to both monitor laboratory performance and also characterize potential mineralization; all consistent with industry best practice.

Drill core samples have undergone preliminary preparation at the Bureau Veritas Mineral Laboratories facility in Ankara, Turkey, and are crushed to 80% passing 10 mesh, and pulverized to 85% passing 200 mesh (PRP70-1KG package). Analyses are conducted at both the Turkey facility and the Bureau Veritas Mineral Laboratories in Vancouver, Canada, with diamond drill core analyses utilizing Aqua Regia digestion and ICP-ES for base metal and silver analyses (AQ370 package), and Infill sample program utilizing Aqua Regia digestion and ICP-MS/ICP-ES (AQ270 package) for base metal and silver analyses. Gold analyses are conducted at the Turkey Bureau Veritas Mineral Laboratories facility via Fire Assay Fusion with AA finish, and gravimetric analyses are completed for over-limit samples (FA430, FA530-Au packages).

Information recorded from diamond drill core assaying was integrated using industry standard data management software (Maxwell Datashed).

More information on the Company can be viewed at the Company's website: www.eastafricametals.com

MORE MINING NEWS

GET DAILY NEWS FLOW

Sign Up To Receive All Morning
News To Your Email Inbox

Please review our Disclaimer and Privacy Policy before subscribing.

COLLECTIVE MINING (TSX: CNL)

Collective Mining

Collective Mining is a gold, silver, copper and tungsten exploration company with projects in Caldas, Colombia. The Company has options to acquire 100% interests in two projects located directly within an established mining camp with ten... LEARN MORE