Vancouver, BC / TheNewswire / January 3, 2018 - Nortec Minerals Corp. (TSX-V: NVT; OTC-PK: NMNZF) (the "Company" or "Nortec") - Nortec announces results from seven diamond core holes on the Tom 1 Target, Tomboko Project, Northeastern Guinea, West Africa (Figure 1). Five holes, TBDD003, 004, 005, 006 and 007 were drilled on Priority 1 Target (Figures 3 and 4) and two drill holes TBDD0001 and 002 were drilled on Priority 3 Target (Figure 3).
Highlights
- Assay results received from hole TBDD0007 include:
Cut-off 0.5 g/t and up to 2m internal dilution
- 9m at 2.74 g/t gold from 32m, including 3.57m at 3.91 g/t from 36m.
- 7m at 3.57 g/t gold from 43m, including 1m at 17.1 g/t from 45m.
Cut-off 0.2 g/t and 2m internal dilution
- 19m at 2.64 g/t from 31m.
- Results define a significant orogenic gold system with both narrow high grade intervals and wide lower grade intervals opening up to the Southeast with drill hole TBDD0007.
- The gold system trending and raking to the Southeast, and is open down dip and to the Southeast.
- Drilling commencing from TBDD0003, 0004, 0005 and 0006 from the Northwest on the Priority 1 Target shows the gold values increasing to the Southeast (Table 1).
The core drilling program was halted pending receipt of the assays from the seven drill holes. This allowed to both conserve funds and time to interpret the geology and plan the next drilling phase. With the receipt of significant results in the last hole, TBDD0007, the next phase of drilling is expected to commence in late January 2018 to define and delineate the Priority 1 Target to the Southeast. This drilling will consist of less expensive Rotary Air Blast (RAB) and Reverse Circulation Drilling (RC). The drilling will also test the rest of the termite mound anomalies, geochemical soil and termite mound anomalies, as well as artisanal workings on the Tom 1, Tom 2 and Tom 3 targets. This is intended to further assist in defining target areas for carrying out an exploration program in a cost-efficient manner.
Mohan Vulimiri, CEO and Chairman comments, "We are very pleased with the receipt of significant results in drill hole TBDD0007. This provides the Company a great opportunity to systematically carry out a drilling program to define and delineate a shallow gold-bearing Priority 1 Zone as well as test all the other geochemical anomalies and artisanal workings."
Details with respect to the geology and historical geochemical results are contained in press releases on the Company's website. Further to the Company press release dated November 7, 2017, the Nortec is amending and updating the NI-43-101 Technical Report on review and comments by TSX Venture Exchange. The Report was filed on SEDAR on November 8, 2017.
The drill core was sawed in half and the samples were analysed by SGS Labs, an accredited laboratory in Bamako, Mali. A duplicate, a blank and a standard were inserted every 10th sample for quality control. Samples are processed by Fire Assay with A.A. finish under the SGS FAA505 protocol.
Mohan R. Vulimiri, M.Sc., P.Geo, CEO, Nortec Minerals, is a Qualified Person as defined by NI 43-101. Mr. Vulimiri has approved the corporate and technical content contained in this press release
About Nortec Minerals Corp.
Nortec is a mineral exploration and development company based in Vancouver, British Columbia. The Company has a 49% interest in the Tammela Lithium and Gold Project in South-West Finland. Sunstone Metals (formerly Avalon Minerals), a public Australian mining company has earned the 51% interest and is carrying out the 29% Stage 2 earn-in interest on the Tammela Project. Sunstone has completed more than 3,000 meters diamond drilling on the Kietyonmaki Lithium prospect and the Satulinmaki and Riukka gold prospects that comprise the Tammela Project. Drilling on the Kietyonmaki returned values of 42.1m at 1.05% Li2O from 17.9m downhole, including 24.2m at 1.44% Li2O from 17.9m and 9m at 2.00% Li2O from 29m downhole. Detailed information on the Company's projects have been posted on the Company's website www.nortecminerals.com.
Table1 |
||||
Priority 1 Target |
||||
Hole No: |
from (m) |
to (m) |
interval |
grams/tonne |
TBDD0004 |
0 |
1 |
1 |
0.67 |
TBDD0005 |
0 |
1 |
1 |
1.18 |
TBDD0005 |
1 |
2.36 |
1.36 |
0.21 |
TBDD0006 |
0 |
0.7 |
0.7 |
0.36 |
TBDD0006 |
0.7 |
2 |
1.3 |
0.22 |
TBDD0006 |
57 |
58 |
1 |
0.36 |
TBDD0006 |
58 |
59 |
1 |
0.35 |
TBDD0006 |
79 |
80 |
1 |
6.50 |
TBDD0006 |
150 |
151 |
1 |
0.20 |
TBDD0006 |
151 |
152 |
1 |
0.16 |
TBDD0006 |
152 |
153 |
1 |
0.16 |
TBDD0003 |
15 |
16 |
1 |
0.62 |
TBDD0003 |
16 |
17 |
1 |
2.26 |
TBDD0003 |
17 |
18 |
1 |
5.24 |
TBDD0003 |
18 |
19 |
1 |
0.18 |
TBDD0007 |
31 |
32 |
1 |
0.20 |
TBDD0007 |
32 |
33 |
1 |
1.23 |
TBDD0007 |
33 |
34 |
1 |
2.04 |
TBDD0007 |
34 |
35 |
1 |
2.89 |
TBDD0007 |
38 |
39 |
1 |
4.28 |
TBDD0007 |
39 |
39.57 |
0.57 |
4.60 |
TBDD0007 |
44 |
45 |
1 |
1.65 |
TBDD0007 |
45 |
46 |
1 |
17.10 |
TBDD0007 |
46 |
47 |
1 |
2.58 |
TBDD0007 |
47 |
48 |
1 |
0.41 |
TBDD0007 |
48 |
49 |
1 |
0.32 |
TBDD0007 |
49 |
50 |
1 |
1.66 |
Drill Holes TBDD0001, TBDD0002 - Priority 3 Target |
||||
TBDD0001 |
38 |
39 |
1 |
0.98 |
TBDD0002 |
10 |
11 |
1 |
0.52 |