New Age Metals

Azarga Metals Announces Maiden Mineral Resource Estimate for Unkur Deposit

VANCOUVER, April 4, 2017 /CNW/ - AZARGA METALS CORP. ("Azarga Metals" or the "Company") (TSX-V:AZR) announces the results of its maiden Mineral Resource estimate for its Unkur Copper-Silver Project in the Zabaikalsky Region of eastern Russia. The estimate is an Inferred Mineral Resource of 42 million tonnes at 0.52% copper and 38g/t silver, containing 220,000 tonnes (ie, 480 million pounds) of copper and 52 million ounces of silver. This equates to approximately 380,000 tonnes (ie, 840 million pounds) of copper equivalent at 0.90% or approximately 124 million ounces of silver equivalent at 91g/t, assuming a copper price of US$3.00/lb, silver price of US$20/oz and 100% recovery. The Mineral Resource estimate was independently prepared by SRK Consulting (Russia) Ltd. ("SRK"), in accordance with NI 43-101.

"The maiden Mineral Resource estimate is a very successful result from just our first few months of physical exploration at Unkur," said Dorian L. (Dusty) Nicol, the Company's president and CEO. He went on to say, "importantly, mineralization is open in multiple directions, which supports growth potential" and "this further stimulates our belief that Unkur has the potential to be a globally significant copper-silver deposit."

A Technical Report covering the Mineral Resource estimate will be filed on SEDAR within 45 days of this news release.

SUMMARY

An Inferred Mineral Resource was estimated based on three domains. Zone 1 is the stratigraphically upper zone of mineralization and Zone 2 is the stratigraphically lower zone, which is divided into a northern (N) and southern (S) sub-zone. Zone 1 and Zone 2 are further divided into near surface and underground mineralization.

Table 1: Unkur Copper-Silver Project Inferred Mineral Resource estimate summary as at 31 March 2017
Category / zone   Tonnage
(million
tonnes)
  Copper
grade (%)
  Silver
grade (g/t)
  Copper
equivalent
grade (%)
  Silver
equivalent
grade (g/t)
Near surface (NS)                    
 - Zone 1   23   0.54   40   0.93   95
 - Zone 2 (North)   9   0.47   43   0.89   91
 - Zone 2 (South)   1   0.42   4   0.46   47
 - Total near surface   33   0.52   39   0.90   92
                     
Underground (UG)                    
 - Zone 1   8   0.53   34   0.86   88
 - Zone 2 (North)   1   0.47   43   0.89   91
 - Total underground   10   0.52   35   0.87   88
Zone 1 NS + UG   31   0.54   38   0.91   93
Zone 2 NS + UG   11   0.46   38   0.84   85
Total Resource   42   0.52   38   0.90   91
Notes: (1) CIM Definition Standards were followed for Mineral Resources; (2) Pit constrained Mineral Resources are reported within a conceptual pit shell; (3) Mineral resources are not Mineral Reserves and do not have demonstrated economic viability; (4) Mineral Resources are reported at a cut-off grade of 0.3% copper equivalent for near surface and 0.7% copper equivalent for underground; (5) copper and silver equivalent grades were estimated using US$3.00/lb copper price, US$20.00/oz silver price and 100% recovery using the formulae Cu eq = Cu + (0.009722 x Ag) and Ag eq = Ag + (102.86 x Cu); and (6) numbers may not add due to rounding.

GROWTH POTENTIAL

Azarga Metals considers that there is strong potential to grow the Mineral Resource at the Unkur Copper-Silver Project beyond that identified in this maiden Mineral Resource estimate. The mineralization is open in both directions along strike and further exploration drilling will aim to extend mineralization along strike. Of key interest for growth potential is the zone of thicker and higher grade mineralization in the northern part of the Inferred Mineral Resource area (see Figure 2). The next phase of work will focus on using geologic and geophysical exploration to target potential extensions of this higher grade zone. The mineralization also remains open down-dip. In addition to this Unkur Copper-Silver Project Inferred Mineral Resource area and its potential extensions, there are numerous additional occurrences of copper-silver mineralization and geochemical / geophysical anomalies within the Company's 5,390 hectare Unkur License.

DETAILS OF MINERAL RESOURCE ESTIMATE DATED 31 MARCH 2017

Details of Mineral Resource estimate dated 31 March 2017

The Mineral Resource estimate was prepared by SRK, under the direction of Robin Simpson MAIG, an independent Qualified Person as defined by National Instrument 43-101 ("NI 43-101"). The results are reported in accordance with NI 43-101 and the 2014 CIM Definition Standards. The Qualified Person visited the Unkur Copper-Silver Project and SGS Laboratories in Chita during October 2016.

Robin Simpson has approved this written disclosure of the Mineral Resource estimate.

Data verification

The Qualified Person has verified the database the Mineral Resource estimate is based on. This verification was done by personal inspection of drill core, drill sites and trenches during the site visit, and by checking database content against primary data sources and historical information.

Exploration Information

The estimate is based on 4,580 meters of diamond drilling (from 16 drill-holes) and 186 meters of channel sampling (from four trenches), completed during Azarga Metals' exploration campaign from August 2016 until February 2017.

In the opinion of the Qualified Person, the core and channel samples collected by Azarga Metals are sufficiently accurate and reliable for use in Mineral Resource estimation, and there are no material data quality issues related to drilling, sampling, recovery or other factors.

Intervals identified by Azarga Metals' geologists as potentially mineralized were sampled, typically on one meter lengths. The half-core samples from drill core, and channel samples from trenches, were sent to SGS Laboratories in Chita for analysis of copper and silver.  Standard QA/QC protocols were followed, including analysis of duplicates and standards and check analyses by ALS Laboratories in Chita. The results of this QA/QC checking will be presented in the forthcoming Technical Report.

The main identified zone of copper-silver mineralization (Zone 1) is intersected by 13 drill-holes and two trenches. Drill-hole collar and trench locations are tabulated in Table 2 and the mineralized intersections are summarized in Table 3. The locations of these intersections are shown in Figure 3.

Table 2: Drill-hole collar and trench locations from August 2016 to February 2017 physical exploration program at Unkur Copper-Silver Project
Hole or
trench ID
  X   Y   Z (RL m)   Maximum
depth (m)
  Starting
dip (deg)
  Starting
azimuth
(deg)
AM-020   20595906   6303578   902.7   284.9   -70   249
AM-001   20595871   6303108   929.7   400.5   -69   241
AM-002   20596077   6303227   919.4   520.5   -70   248
AM-003   20595911   6302753   930.5   100.0   -72   242
AM-004   20596093   6302871   935.5   382.9   -70   242
AM-005   20596247   6302510   913.7   160.0   -71   241
AM-006   20596388   6302620   955.1   572.0   -69   221
AM-007   20596411   6302155   927.7   80.0   -70   222
AM-008   20596611   6302365   1,007.8   601.3   -72   228
AM-009   20596725   6301968   983.0   238.0   -69   224
AM-011   20596936   6301672   952.3   178.5   -68   223
AM-013   20597233   6301394   995.8   100.0   -68   220
AM-015   20597567   6301246   1042.0   201.0   -68   217
AM-017   20596211   6302467   916.1   277.5   -71   230
AM-019   20596639   6301879   938.9   226.7   -69   224
AM-018   20595635   6302977   937.8   256.6   -73   241
TR K601   20596492   6301887   969.1   14.0   0   236
TR K615   20597213   6301311   1,015.4   115.0   0   222
TR K616   20597472   6301143   1,049.5   29.0   0   233
Table 3: Intersections used for estimation(1)
Hole or trench ID   From
(m)
  To
(m)
  Length
(m)
  Copper
grade (%)
  Silver
grade (%)
  Copper
equivalent
grade (%)
  True
thickness
(m)
Zone 1                            
AM-020   227.0   241.0   14   0.51   28.44   0.79   10.6
AM-001(2)   82.5   125.5   33   0.83   79.81   1.61   20.1
AM-002   432.5   472.5   40   0.31   12.77   0.44   33.8
AM-003(3)   40.5   77.5   37   0.43   39.63   0.82   26.9
AM-004(4)   319.5   358.5   31   0.44   27.23   0.70   23.7
AM-006   440.5   456.5   16   0.34   11.02   0.45   14.4
AM-007   47.0   60.0   13   0.25   17.12   0.41   10.9
AM-008   352.3   364.3   12   0.24   6.02   0.30   9.9
AM-011   145.5   153.9   8.4   0.92   61.73   1.52   7.3
AM-013   70.0   78.0   8   0.53   22.62   0.75   6.8
AM-015   135.0   145.0   10   0.29   4.55   0.34   8.7
AM-017   189.5   202.5   13   1.28   103.91   2.29   9.8
AM-019   39.0   49.0   10   0.48   12.39   0.60   8.6
TR K615   8.0   17.0   9   0.30   14.03   0.44   6.9
TR K616   18.0   29.0   11   0.41   6.32   0.47   8.1
Zone 2 (N)                            
AM-001   311.5   346.5   35   0.47   43.49   0.89    
AM-019   106.0   119.0   13   0.17   4.99   0.22    
Zone 2 (S)                            
TR K601   0.0   10.0   10   0.73   2.07   0.75    
 

Notes: (1) copper and silver equivalent grades were estimated using US$3.00/lb copper price, US$20.00/oz silver price and 100% recovery using the formulae Cu eq = Cu + (0.009722 x Ag) and Ag eq = Ag + (102.86 x Cu); (2) mineralization begins at base of moraine, possibly intersection has been truncated by glacial erosion – composite excludes barren zone from 104.5 to 114.5; (3) mineralization begins at base of moraine, possibly intersection has been truncated by glacial erosion; and (4) composite excludes barren zone from 335.5 to 343.5.

Section lines for drilling are spaced approximately 300m apart. Where there are two Zone 1 intersections on the same drill section, the spacing between intersections is typically 200m to 300m.

Estimation methodology and parameters

A wireframe interpretation of Zone 1 was constructed at a nominal threshold of 0.10% copper. Based on the limits of the current sampling coverage, the modelled domain has a strike length of 3,400 meters northwest-southeast, and a down dip extent of up to 550 meters, but this zone is open down dip and along strike in both directions. The Zone 1 domain generally dips 50 to 60 degree to the east or northeast, and has an average true thickness of 19 meters. 

Approximately parallel to Zone 1, and 100 to 150m southwest, a second zone of mineralization has been interpreted, from two drill intersections, one trench intersection, and one outcrop. This second zone is stratigraphically below Zone 1.

The Lower Proterozoic sedimentary rocks that host mineralization are partly covered by Quaternary moraine. The thickness of the moraine cover over the northern part of the mineralization is up to 100 meters. The moraine cover generally is thinner to the south, and mineralization in the southern part of Zone 1 and Zone 2 can be exposed by trenching.

Topography was modelled based on drill collar locations, and using additional elevation information digitized from topographic maps.

Copper and silver grades within the Zone 1 mineralized domain were estimated by 2D Ordinary Kriging. A single 2D composite was generated for each intersection. The true thickness assigned to each composite was calculated based on the local orientations of the drill intersection and the Zone 1 wireframe. No grade capping was applied to either the samples or the composites. The block size for 2D Kriging was 100 meters north-south and 100 meters vertically. The results of the estimation were copied into a 3D block model, with sub-blocking down to 1.5625 meters, in order to achieve a good fit to the relatively narrow mineralization wireframe.

The copper and silver grades for Zone 2, which contains fewer intersections than Zone 1, were estimated by a simple average of sample grades for the northern and southern portions.

For the mineralized domains and the host rocks, a dry bulk density value of 2.67t/m3 was used for converting volumes into tonnages. This factor is the average value of samples collected by Azarga. A dry bulk density factor of 2.0t/m3 was assumed for the moraine material.

The portion of the mineralization model that met the CIM definition of a Mineral Resource ("…reasonable prospects for eventual economic extraction") was established by using NPV Scheduler software to generate a pit shell to constrain reporting of the near surface resource. The input parameters for the pit shell are shown in Table 4. Within the pit (the near surface component of the resource), no mineralized blocks have an estimated grade of less than 0.4% (copper equivalent), and no further cut-off grade was applied. Below the pit, a cut-off grade of 0.7% (copper equivalent) was applied to define an underground component of the Mineral Resource. This cut-off was estimated using the same parameters in Table 4, but assuming 20% dilution and an underground mining production cost of US$20 per tonne.

Table 4: Economic parameters for pit shell
Parameters   Units   Amount
Geotechnical        
 - Moraine slope   Deg   30
 - Bedrock slope   Deg   45
Mining factors        
 - Dilution (at 0 grade)   %   5
 - Recovery   %   95
Processing        
 - Copper recovery   %   90
 - Silver recovery   %   90
Operating costs        
 - Waste mining cost   US$/trock   1.20
 - Resource mining cost   US$/trock   1.50
 - Incremental mining cost   US$/1m   0.005
 - Reference level   Z Elevation   1,000
 - Processing cost   US$/tore   10.00
 - G&A   US$/tore   2.00
 - Royalty, selling cost (Cu)   %   8.0
 - Royalty, selling cost (Ag)   %   6.5
Metal price        
 - Copper   US$/lb   3.00
 - Silver   US$/oz   20.00

All Mineral Resources were classified as Inferred, based on the intersection spacing relative to the interpreted continuity and potential complexity of the deposit.

Qualified Person

The Company's President and Chief Executive Officer, Dorian L. (Dusty) Nicol, B.Sc. Geo, MA Geo, a Qualified Person as defined by NI 43-101, has reviewed and approved the exploration information disclosures contained in this Press Release.

About Azarga Metals Corp.

Azarga Metals is a mineral exploration and development company that owns 60% of the Unkur Copper-Silver Project in the Zabaikalsky province in eastern Russia.

MORE MINING NEWS

GET DAILY NEWS FLOW

Sign Up To Receive All Morning
News To Your Email Inbox

Please review our Disclaimer and Privacy Policy before subscribing.

NEWCORE GOLD (TSX.V: NCAU)

Newcore Gold

Newcore Gold is advancing the Enchi Gold Project in Ghana. The project’s 216 sq. km land package covers 40 kms of Ghana’s Bibiani Shear Zone, a gold belt which hosts several large, multi-million-ounce, gold deposits... LEARN MORE