Vizsla Silver

Klondike Gold Update on Phase 2 Exploration Program

VANCOUVER, BC / ACCESS Newswire / August 13, 2025 / Klondike Gold Corp. (TSXV:KG) (FRA:LBDP) (OTCQB:KDKGF) ("Klondike Gold" or the "Company") is pleased to provide an update on the Company's Phase 2 exploration activities following the successful completion of the 13-hole Phase 1 drill program on the Company's 100% owned a Klondike District Property (the "Property") spanning 729 square kilometer bedrock gold of advanced exploration (see Figure 1).

Peter Tallman, President and CEO of Klondike states; "Phase 2 mapping results are identifying new targets leading into an exciting Phase 3 drilling program set to begin shortly. Through the extensive re-evaluation of the Klondike regional geology, we have incorporated much of previous drilling, sampling and mapping into 3D visualization software (Leapfrog), which has significantly advanced our understanding of the gold mineralizing structures in the Klondike region enhancing our ability and confidence to target gold bearing structures to much greater depths. This modelling is informing the upcoming Phase 3 drill testing of lateral and deep extensions to high grade gold vein zones."

Phase 1 drilling tested the orientation of major structures that control gold deposition at four separate gold showings along a 3.8km section of the Eldorado Fault Corridor. This work yielded important structural and alteration information regarding favourable environments for gold-bearing veins within the Eldorado Target. Assays from 13 holes drilled in Phase 1 are pending. The Phase 1 drill program informs Phase 2 work helping to complete detailed 3D structural and lithologic maps for each of the Company's four main gold zones (Lone Star, Nugget, Stander, Gay Gulch) and integrating them into an encompassing interpretation of gold mineralization for the Klondike District.

The Phase 2 program comprised of mapping and re-evaluation synthesizing 10+ years of the Company's modern exploration data, incorporating specific insights gained in the recent Phase 1 drilling program. Phase 2 work is a field and desktop compilation effort which systematizes the geology and structural controlling gold mineralization regionally throughout the Klondike District. Phase 2 results include differentiating and mapping regional thrusts, faults, and fracture faults including those controlling gold mineralization, identification of major regional folds, and a recharacterization of main Klondike lithologies. This work significantly updates the benchmark 1980's vintage government geological survey mapping and derived observations.

Phase 2 mapping work includes:

  • drill core relogging and mapping later faults in 3 dimensions (using Leapfrog 3D visualization software). This involves re-examination of over 60,000 meters of past drill core collected from the Property since 1980 and maintained as part of the Company's core library.

  • analysis of over 10,000 oriented drill core structural measurements to map the 3D distribution of major rock units, with particular focus on prospective lithology contacts associated with gold mineralization, and documenting different fault types.

  • a lithology remapping program using the Company's airborne radiometric and total field magnetic data considered in combination with new mapping of graphitic thrusts and other faults.

  • systematic short wavelength infrared (SWIR) imaging of mineral characteristics in gold-rich vein areas. This imaging helps identify gold-associated alteration and is extremely useful in qualifying gold-rich versus gold-poor vein zones using methodologies developed from recent academic research.

A Phase 3 program with drill specific targets recommended from Phase 2 work is planned to commence in early September.

Junior Mining NetworkFigure 1: Location of Klondike Gold's bedrock gold 729 square kilometer "Klondike District Project" and the Montana Creek Placer lease operation.

QUALIFIED PERSONS REVIEW

The technical and scientific information contained within this news release has been reviewed and approved by Peter, Tallman, P.Geo., President of Klondike Gold and Qualified Person as defined by National Instrument 43-101 policy.

ABOUT KLONDIKE GOLD CORP.

Klondike Gold is a Vancouver based gold exploration company advancing its 100%-owned Klondike District Gold Project located at Dawson City, Yukon, one of the top mining jurisdictions in the world. The Klondike District Gold Project targets gold associated with district scale orogenic faults along the 55-kilometer length of the famous Klondike Goldfields placer district. Gold mineralization and indicated/inferred mineral resources have been identified at both the Lone Star Zone and Stander Zone1, among other targets. The Company retains a 10% production royalty on the active Montana Creek placer property with payments capped at $9.5M total over 6 years. The Company is focused on exploration and development of its 729 square kilometer property accessible by scheduled airline and government-maintained roads located on the outskirts of Dawson City, Yukon, within the Tr'ondëk Hwëch'in First Nation traditional territory.

ON BEHALF OF KLONDIKE GOLD CORP.

"Peter Tallman"

Peter Tallman,
President and CEO

FOR FURTHER INFORMATION:
Telephone: (604) 609-6110
E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Website: www.klondikegoldcorp.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Certain statements contained in this news release constitute "forward-looking statements". When used in this document, the words "anticipated", "expect", "estimated", "forecast", "planned", and similar expressions are intended to identify forward-looking statements or information. These statements are based on current expectations of management, however, they are subject to known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from the forward-looking statements in this news release. Readers are cautioned not to place undue reliance on these statements. Klondike Gold does not undertake any obligation to revise or update any forward-looking statements as a result of new information, future events or otherwise after the date hereof, except as required by securities laws.

Forward‐looking statements involve numerous risks and uncertainties and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things, market volatility; the state of the financial markets for the Company's securities; fluctuations in commodity prices and changes in the Company's business plans. In making the forward looking statements in this news release, the Company has applied several material assumptions that the Company believes are reasonable, including without limitation, that the Company will continue with its stated business objectives and its ability to raise additional capital to proceed. Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial out-look that are incorporated by reference herein, except in accordance with applicable securities laws. The Company seeks safe harbor.

For more information on the Company, investors should review the Company's continuous disclosure filings that are available at www.sedarplus.ca.

[1]The Mineral Resource Estimate for the Klondike District Property was prepared by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting Inc., an independent Qualified Person in accordance with the requirements of NI 43-101. The technical report supporting the Mineral Resource Estimate entitled "NI 43-101 Technical Report on the Klondike District Gold Project, Yukon Territory, Canada" has been filed on SEDAR at www.sedarplus.ca effective November 10, 2022. Refer to news release of December 16, 2022.

GET DAILY NEWS FLOW

Sign Up To Receive All Morning
News To Your Email Inbox

Please review our Disclaimer and Privacy Policy before subscribing.