Vizsla Silver

Avesoro Resources Inc. Encouraging Drilling Results from 2017 Exploration Campaign and 2018 Exploration and Development Programme

TORONTO, Feb. 1, 2018 /CNW/ - Avesoro Resources Inc. ("Avesoro" or the "Company"), the TSX and AIM listed West African gold producer, is pleased to announce further high-grade drilling intercepts from its H2 2017 Burkina Faso focused exploration campaign and to provide details on its fully funded and board approved US$25 million exploration programme for 2018.

Drilling Result Highlights

  • Drilling of Balogo near mine targets returns high grade intersections including:
    • BDH-241: 22.30g/t Au over 5.45 metres (including 44.84g/t Au over 2.50 metres);
    • BDH-208: 28.11g/t Au over 5.10 metres (including 68.70g/t Au over 2.00 metres);
    • BDH-221: 21.16g/t Au over 3.40 metres; and
    • BDH-252: 12.12g/t Au over 4.00 metres (including 31.50g/t Au over 1.35 metres).
  • Mineralisation underneath the optimised Balogo open pit shell is now identified over a 140 metre vertical extent averaging 3.51 metres at 36.34g/t Au in drilling to date;
  • Drilling at A2NE Mid Pit, which is currently being mined, has significantly extended the vertical depth of the mineralisation by a further 65 metres. Intersections include:
    • YNE-17-116: 35.45g/t Au over 3.65 metres (including 138g/t Au over 0.90 metres); and
    • YNE-17-112: 15.32g/t Au over 4.40 metres (including 35.32g/t Au over 1.75 metres).
  • Additional drilling at the Gassore prospect has intersected further high grade mineralisation, including:
    • GASS-17-003: 6.20g/t Au over 3.05 metres (including 13.90g/t Au over 1.15 metres);
    • GASS-17-023: 7.34g/t Au over 3.85 metres (including 15.45g/t Au over 1.60 metres); and
    • GASS-17-047: 7.99g/t Au over 2.75 metres.

Further details of the key intercepts can be found in Appendix 1 of this announcement.

2018 Exploration Programme Highlights

  • Group exploration drilling budget of 171,000 metres approved for West Africa, split between Burkina Faso (139,000 metres) and Liberia (32,000 metres);
  • Burkina Faso near-mine drilling campaign to include 54,000 metres focused on nine targets at Youga and five targets at Balogo, with another 85,000 metres of regional drilling at priority targets within trucking distance of the Youga plant; and
  • Liberia near-mine drilling campaign of 17,000 metres focused on satellite target resource development and 15,000 metres of regional drilling focused on the advanced Ndablama target.

Serhan Umurhan, Chief Executive Officer of Avesoro, commented:

"The drilling results delivered by the team over the past six months have been highly encouraging, with our exploration success in Burkina Faso throughout H2 2017 resulting in an increase in production guidance at the Youga Gold Mine to encompass the additional ounces we identified at Gassore. This committed and focused drilling campaign will continue in 2018 and I am delighted that further high grade mineralised intercepts have been reported from drilling across both our Youga and Balogo licences. With our aggressive US$25 million 2018 exploration campaign fully funded and board approved, I am confident that this will see the Company identify additional mineral resources at both our New Liberty and Youga & Balogo Gold Mines".

Burkina Faso

Summary of 2017 Exploration Activities

As previously reported, throughout H2 2017, the Company conducted drilling campaigns on several targets across the Youga and Balogo licences in Burkina Faso. A 6,600 metre 45-hole diamond drilling programme was completed across the Balogo licence, which holds the Balogo Gold Mine, with drilling predominantly focused on the following targets: Balogo Hill, Panga, Cobra Hill, Balogo North, Balogo Northwest, Balogo Southeast and Balogo Down Dip Extension.

Youga On Mine Development

Further to the announcement dated January 24 2018, the Company is also pleased to report additional intercepts from its 52,880 metre diamond drilling campaign undertaken throughout late 2017 across the Youga exploitation permit and encompassing the following targets:

  • Gassore (233 holes for 34,530 metres);
  • West Pit 3 East (14 holes for 980 metres);
  • West Pit 4 (45 holes for 4,130 metres); and
  • A2NE Mid Pit Down Dip Extension (72 holes for 8,880 metres).

The success of the 2017 drill programme in Burkina Faso resulted in the discovery of new minable mineralisation at Gassore, located approximately 2 kilometres from the Youga plant and within the Youga exploitation permit, and is included in the Company's 2018 mine plan.

Balogo Down Dip Extension

Drilling at Balogo targeted down-dip extension areas underneath the planned open-pit floor and intersected further high-grade results, with the mineralisation being extended by 140 metres below the planned final pit floor and intersecting an average width and grade of 3.51 metres grading 36.34g/t Au. The high grade mineralised shoot remains open at depth with further deeper drilling to be undertaken throughout 2018. Upon conclusion of the 2018 drilling programme, the Company plans to embark on an underground mining scoping study for the Balogo deposit. Additionally, the Balogo Northwest, Balogo North and Balogo Southeast targets all fall within a 450 metre radius of the existing Balogo open pit and results received warrant further exploration.

The link below illustrates a cross sectional view of the drilling below the Balogo deposit:

Panga

The Panga target is located 700 metres north-east from the Balogo open pit and mineralisation is related to a parallel quartz-sulphide veins system hosted in sheared diorite striking north-northwest and dipping at 85 degrees towards west-southwest. During 2017, eight holes for 1,061 metres were drilled and mineralisation was intersected over a 200 metre strike length with an average width of 3.33 metres grading 11.59g/t Au to a depth of 96 metres below surface. The mineralisation remains open to the north-northeast and south-southwest.

Cobra Hill

One kilometre north-east along strike from the Balogo open pit is the Cobra Hill target, a 1.4-kilometre-long five metre wide magnetite zone with related gold and copper mineralisation located between diorite and sericite schist contact striking northeast, dipping 75 degrees towards to northwest. During 2017, a 12 hole 2,154 metre drilling campaign was completed on selective areas of this trend delivering average intersects of 2.44 metres grading 3.87g/t Au to a depth of 130 metres below surface based on these holes. This mineralised trend remains open along strike and at depth.

Balogo Hill

At the Balogo Hill target, eight holes for 985 metres were drilled testing a 100 metre strike length of a 500-metre-long mineralised trend located 1.2 kilometres north-east from the Balogo open pit. Results delivered to date represent high grade gold mineralisation and have intersected mineralisation with average width of 2.14 metres grading 15.40g/t Au, with mineralisation remaining open both along strike and at depth beyond the deepest mineralization intersected 92 metres below surface. Further drilling is planned for 2018.

Smyrna

The Smyrna target was a new discovery in 2017 located 6.2 kilometres southwest of the Balogo pit. Field rock chip samples to date have returned results grading up to 4.88g/t Au.

Individual intercepts through selected mineralised zones from this comprehensive drilling programme are reported in Appendix 1.

The links below illustrates the location of the drill targets and provides a summary cross sectional view of the Gassore deposit:

2018 Exploration and Development Outlook

The Company plans to update the Mineral Resource and Mineral Reserve for both the Youga and Balogo Gold Mines with an effective date of February 28, 2017 and the New Liberty Gold Mine with effective date of July 31, 2017 with the drilling results obtained during the 2017 and 2018 campaigns during H1 2018.

Drilling during 2018 will focus on identified targets in close proximity to existing Mineral Resources, with a 45,500 metre drilling and 50,600 metre trenching programmes planned for Youga and its adjacent licences.

The figure below provides details on the Company's Burkina Faso Licence Portfolio:

Youga On Mine Development

Drilling has been planned at Gassore for both the western continuation of the target where 1,950 metres of mineralised trend remains open and also to test the target at depth. The Company will also focus on other additional near-mine targets following up mineralised zones identified from 2017 trenching such as WDE, A2NE Southeast and testing other existing near-mine gold anomalies. In total, more than ten kilometres of strike length of gold in soil anomalism will be tested by trenching within the Youga exploitation permit.

Youga Exploration

The Company will also extend its work outside of the Youga exploitation permit and plans to conduct exploration activities on its adjacent Songo and Zerbogo tenements. Zerbogo hosts several kilometres of gold-in-soil anomalies supported by historic trenching and some sparse drilling undertaken by the licences' previous owner. The Company aims to increase the confidence of these mineralised zones by undertaking additional trenching and drilling.

Ouaré

This year, the Company also plans to extend its aggressive exploration strategy at the Ouaré Project located within the Bitou2 permit, 36 kilometres north-east from the Youga processing plant. As per the February 28, 2017 Mineral Reserve and Mineral Resource statement, the Ouaré project has an existing CIM compliant Indicated Mineral Resource of 5.1Mt grading 1.39g/t Au containing 228.3koz and an Inferred Mineral Resource of 7.2Mt grading 1.8g/t Au containing 406koz disclosed in accordance with NI 43-101.

Probable Mineral Reserves currently stand at 2.6Mt grading 1.67g/t Au containing 141koz. During Q2 2018 some 65,000 metres of drilling and 20,185 metres of trenching is planned, with some holes designed to twin some of the previous RC drill holes, undertake an infill drilling campaign to upgrade the confidence level and classification of the existing resource.

A number of existing drill ready targets will be drilled during H1 2018 and trenching will target existing gold-in-soil and gold-in-auger anomalies to increase technical knowledge of the mineralisation trends before drill testing.

Balogo Exploration

Within the Balogo licence, the Company's exploration programme will consist of a 29,000 metre drilling programme following up on the significant intercepts encountered around the Balogo open pit in 2017 including the following:

  • Further drilling will be undertaken to target the Balogo down-dip extension for underground potential;
  • Panga, Balogo Hill and Cobra Hill for near mine high grade satellite pit scenarios.

Additionally, a regional auger sampling programme will be undertaken to follow up upon geophysical and structural targets generated in 2017, combined with geochemistry to outline other potential areas for exploration within the 360km2 licence area of which only 8km2 has been evaluated to date.

The figures below provide details on the location of the near mine targets within the Youga and Balogo exploitation permits:

Liberia

Summary of 2017 Exploration Activities

The Company's exploration team undertook a comprehensive review of all previously identified exploration targets across its licence portfolio and conducted additional geological and geochemical work around previously identified gold in soil anomalies.

In Q4 2017, a 14,000 metre 46-hole infill drilling programme was commenced at New Liberty, with the aim of increasing the confidence in the continuity of the New Liberty ore body and to upgrade the classification of a proportion of Inferred Mineral Resource in the NI 43-101 compliant Technical Report dated November 1, 2017 to an Indicated Mineral Resource.

2018 Exploration Outlook

Activities during 2018 will focus on:

  • Completion of the on-going 46-hole infill drilling programme;
  • Seven hole 6,500 metre deep extension programme at New Liberty planned to test the vertical extension of the high grade plunging shoots of the orebody to 900 metres from surface;
  • A 15,000 metre resource conversion infill drilling campaign will commence at Ndablama, focused upon upgrading the confidence level and classification of the existing Mineral Resources;
  • Embarking on a study to determine the economic potential of trucking ore from Ndablama to the New Liberty process plant for processing; and
  • Exploration drilling of near mine targets.

The figure below provides details on the Company's Liberian licence portfolio and the location of the Cape Mount and Silver Hills targets:

Silver Hills and the Matambo Corridor

First phase exploration drilling is also planned at Silver Hills and the Matambo Corridor targets. Both targets are 15-kilometre-long gold-in-soil targets hosted by ultramafic rocks similar to New Liberty corresponding to the westerly extension of the Bea Mountain Greenstone Belt, and are located within 20 kilometres of the New Liberty processing plant. This will include a 17,000 metre drill programme scheduled to commence drilling upon delivery of the new previously reported new diamond drill rigs to Liberia.

The Matambo Corridor is located 15 kilometres to the north of New Liberty, within the Company's Cape Mount Licences and Silver Hills is 20 kilometres to the north east and within the Bea Mountain Class A Mining Licence. Trenching and pitting has confirmed the original soil sampling anomalies.

Silver Hills has previously reported channel sampling which encountered intercepts including 2.3 metres grading 90g/t Au and at the Matambo Corridor Sarama Resources, the former owner of the licences, previously reported drilling intercepts including 7.5 metres grading 3.9g/t Au and 6 metres grading 3.2 g/t Au from a 1,600 metre 15-hole reconnaissance drilling programme.

The Company will also continue conducting geochemical sampling and surface mapping on prospective areas and mapping and pitting on areas with low confidence with the aim of identifying new drill ready targets for the 2019 campaign.

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

Appendix 1: Key Drill Intercepts from 2017 Burkina Faso Drilling Programme*

Target

Hole ID

From (m)

To (m)

Width* (m)

Au g/t

Comment

A2NE Mid

YNE-17-068

86.40

92.50

6.10

1.59

 

A2NE Mid

YNE-17-068

97.50

98.00

0.50

2.17

 

A2NE Mid

YNE-17-069

21.70

22.80

1.10

1.21

 

A2NE Mid

YNE-17-069

108.50

111.90

3.40

5.05

including  0.75 m @ 15.9 g/t

A2NE Mid

YNE-17-070

38.50

39.00

0.50

2.48

 

A2NE Mid

YNE-17-070

51.70

52.45

0.75

3.73

 

A2NE Mid

YNE-17-070

63.60

64.10

0.50

2.71

 

A2NE Mid

YNE-17-070

145.10

146.00

0.90

1.21

 

A2NE Mid

YNE-17-071R

26.00

27.70

1.70

33.80

 

A2NE Mid

YNE-17-071R

76.45

77.85

1.40

1.29

 

A2NE Mid

YNE-17-071R

82.05

83.50

1.45

6.24

 

A2NE Mid

YNE-17-071R

176.25

177.45

1.20

1.21

 

A2NE Mid

YNE-17-072

17.70

24.00

6.30

7.31

including 1 m @ 41.5 g/t

A2NE Mid

YNE-17-073

24.60

28.00

3.40

3.90

including 0.80 m @ 14.45 g/t

A2NE Mid

YNE-17-073

63.10

63.75

0.65

2.00

 

A2NE Mid

YNE-17-073

87.30

88.00

0.70

1.30

 

A2NE Mid

YNE-17-074

19.50

20.10

0.60

2.43

 

A2NE Mid

YNE-17-074

118.05

120.55

2.50

1.82

 

A2NE Mid

YNE-17-074

123.75

124.45

0.70

1.26

 

A2NE Mid

YNE-17-075

67.75

69.80

2.05

2.11

 

A2NE Mid

YNE-17-075

164.05

165.05

1.00

1.41

 

A2NE Mid

YNE-17-075

166.85

167.80

0.95

1.38

 

A2NE Mid

YNE-17-077

16.40

17.55

1.15

1.04

 

A2NE Mid

YNE-17-079

21.50

23.20

1.70

1.15

 

A2NE Mid

YNE-17-079

24.25

25.50

1.25

1.19

 

A2NE Mid

YNE-17-082

29.65

30.80

1.15

1.19

 

A2NE Mid

YNE-17-071

30.90

31.40

0.50

1.03

 

A2NE Mid

YNE-17-085

18.20

19.10

0.90

1.13

 

A2NE Mid

YNE-17-085

52.75

54.25

1.50

2.69

 

A2NE Mid

YNE-17-085

82.00

82.70

0.70

7.22

 

A2NE Mid

YNE-17-087

11.25

12.25

1.00

1.18

 

A2NE Mid

YNE-17-089

20.45

22.00

1.55

22.70

 

A2NE Mid

YNE-17-089

46.25

46.80

0.55

1.86

 

A2NE Mid

YNE-17-090

8.75

14.00

5.25

2.71

including 0.80 m @ 15.4 g/t

A2NE Mid

YNE-17-090

49.80

51.00

1.20

3.10

 

A2NE Mid

YNE-17-090

60.00

60.70

0.70

10.10

 

A2NE Mid

YNE-17-090

110.55

111.55

1.00

2.93

 

A2NE Mid

YNE-17-091

39.90

42.50

2.60

2.13

 

A2NE Mid

YNE-17-102

15.30

16.65

1.35

1.47

 

A2NE Mid

YNE-17-101

13.15

14.00

0.85

2.07

 

A2NE Mid

YNE-17-104

32.30

33.20

0.90

3.89

 

A2NE Mid

YNE-17-106

21.35

21.85

0.50

1.48

 

A2NE Mid

YNE-17-108

18.70

19.60

0.90

3.07

 

A2NE Mid

YNE-17-109

47.55

49.10

1.55

2.88

 

A2NE Mid

YNE-17-111

20.50

21.55

1.05

1.09

 

A2NE Mid

YNE-17-111

109.10

109.70

0.60

1.35

 

A2NE Mid

YNE-17-114

19.60

20.80

1.20

10.10

 

A2NE Mid

YNE-17-114

110.85

111.75

0.90

16.25

including 1.10 m @ 39.7 g/t

A2NE Mid

YNE-17-112

100.45

104.85

4.40

15.32

including 1.75 m @ 35.32 g/t

A2NE Mid

YNE-17-115

81.50

82.00

0.50

2.82

 

A2NE Mid

YNE-17-115

114.75

115.65

0.90

11.90

 

A2NE Mid

YNE-17-116

112.00

115.65

3.65

35.45

including 0.90 m @ 138 g/t

A2NE Mid

YNE-17-116

132.25

132.85

0.60

9.05

 

A2NE Mid

YNE-17-103

33.40

33.90

0.50

3.32

 

A2NE Mid

YNE-17-107

22.40

23.00

0.60

1.11

 

A2NE Mid

YNE-17-110

9.00

9.95

0.95

1.27

 

A2NE Mid

YNE-17-110

19.80

20.80

1.00

2.02

 

A2NE Mid

YNE-17-110

28.70

30.20

1.50

1.57

 

A2NE Mid

YNE-17-121

2.40

4.00

1.60

14.85

 

A2NE Mid

YNE-17-121

25.65

26.65

1.00

1.59

 

A2NE Mid

YNE-17-121

33.55

34.40

0.85

2.39

 

A2NE Mid

YNE-17-121

41.55

42.15

0.60

2.84

 

A2NE Mid

YNE-17-122

13.05

14.00

0.95

1.11

 

A2NE Mid

YNE-17-122

17.10

18.00

0.90

1.13

 

A2NE Mid

YNE-17-122

103.15

104.45

1.30

1.22

 

A2NE Mid

YNE-17-123

30.10

31.40

1.30

1.09

 

A2NE Mid

YNE-17-123

34.65

35.90

1.25

7.30

 

A2NE Mid

YNE-17-123

153.00

154.20

1.20

2.31

 

A2NE Mid

YNE-17-123

161.55

162.55

1.00

165.50

 

A2NE Mid

YNE-17-124

3.50

4.00

0.50

3.17

 

A2NE Mid

YNE-17-124

22.10

23.15

1.05

17.85

 

A2NE Mid

YNE-17-125

5.15

7.20

2.05

5.49

including 0.9 m @ 9.24 g/t

A2NE Mid

YNE-17-125

44.00

45.10

1.10

25.20

 

A2NE Mid

YNE-17-126

19.70

20.8

1.10

1.15

 

A2NE Mid

YNE-17-126

46.50

47

0.50

17.25

 

A2NE Mid

YNE-17-126

96.75

97.4

0.65

1.16

 

A2NE Mid

YNE-17-126

101.80

103.5

1.70

1.98

 

A2NE Mid

YNE-17-126

135.75

136.6

0.85

1.03

 

A2NE Mid

YNE-17-092

20.85

22.75

1.90

1.95

 

A2NE Mid

YNE-17-092

63.10

63.7

0.60

10.20

 

A2NE Mid

YNE-17-093

1.05

1.8

0.75

1.95

 

A2NE Mid

YNE-17-094

8.85

10.25

1.40

2.50

 

A2NE Mid

YNE-17-094

24.50

25.15

0.65

3.70

 

A2NE Mid

YNE-17-094

34.55

35.65

1.10

1.80

 

A2NE Mid

YNE-17-095

59.90

60.70

0.80

2.17

 

A2NE Mid

YNE-17-096

45.30

46.75

1.45

3.22

 

A2NE Mid

YNE-17-097

41.10

42.50

1.40

1.29

 

A2NE Mid

YNE-17-097

49.15

49.80

0.65

1.82

 

A2NE Mid

YNE-17-097

68.80

69.95

1.15

1.86

 

A2NE Mid

YNE-17-098

18.30

19.20

0.90

2.66

 

A2NE Mid

YNE-17-098

83.40

84.65

1.25

4.91

 

A2NE Mid

YNE-17-098

101.15

102.00

0.85

26.20

 

A2NE Mid

YNE-17-098

131.55

132.15

0.60

5.28

 

A2NE Mid

YNE-17-098

159.95

160.65

0.70

1.32

 

A2NE Mid

YNE-17-117

41.30

41.80

0.50

1.79

 

A2NE Mid

YNE-17-118

68.00

68.90

0.90

3.06

 

A2NE Mid

YNE-17-119

2.40

5.10

2.70

2.05

 

A2NE Mid

YNE-17-119

17.30

18.50

1.20

29.90

 

A2NE Mid

YNE-17-120R

13.30

14.05

0.75

19.30

 

Gassore

GASS-17-001

38.90

45.30

6.40

19.63

Including 4.60 m @ 26.57 g/t

Gassore

GASS-17-001

81.20

82.40

1.20

16.60

 

Gassore

GASS-17-002

89.05

89.65

0.60

17.60

 

Gassore

GASS-17-002

123.30

124.00

0.70

18.65

 

Gassore

GASS-17-003

27.95

31.00

3.05

6.20

Including 1.15 m @ 13.90 g/t

Gassore

GASS-17-003

37.85

39.30

1.45

1.03

 

Gassore

GASS-17-003

94.70

95.20

0.50

5.71

 

Gassore

GASS-17-004

32.30

33.30

1.00

1.93

 

Gassore

GASS-17-005

44.40

45.40

1.00

5.95

 

Gassore

GASS-17-005

84.10

85.00

0.90

24.60

 

Gassore

GASS-17-005

113.10

113.65

0.55

3.86

 

Gassore

GASS-17-006

20.50

21.00

0.50

6.27

 

Gassore

GASS-17-007

64.50

65.00

0.50

9.46

 

Gassore

GASS-17-008

51.00

51.80

0.80

1.14

 

Gassore

GASS-17-009

113.00

113.50

0.50

1.01

 

Gassore

GASS-17-010

46.05

47.05

1.00

2.21

 

Gassore

GASS-17-010

81.80

83.00

1.20

3.00

 

Gassore

GASS-17-011

22.70

23.85

1.15

2.02

 

Gassore

GASS-17-011

30.90

31.80

0.90

6.41

 

Gassore

GASS-17-011

69.15

70.40

1.25

16.45

 

Gassore

GASS-17-012

50.05

50.75

0.70

8.38

 

Gassore

GASS-17-013

21.85

25.95

4.10

5.41

 

Gassore

GASS-17-014

19.70

20.35

0.65

8.19

 

Gassore

GASS-17-015

20.65

22.15

1.50

3.56

 

Gassore

GASS-17-016

22.00

22.75

0.75

16.55

 

Gassore

GASS-17-016

35.35

41.40

6.05

1.76

Including 0.70 m @ 7.19 g/t

Gassore

GASS-17-017

21.45

22.30

0.85

23.40

 

Gassore

GASS-17-018

57.70

58.35

0.65

2.25

 

Gassore

GASS-17-019

25.10

26.10

1.00

62.80

 

Gassore

GASS-17-020

0.00

1.00

1.00

1.47

 

Gassore

GASS-17-020

52.15

52.95

0.80

2.44

 

Gassore

GASS-17-021

34.00

34.55

0.55

5.69

 

Gassore

GASS-17-021

72.70

73.30

0.60

17.75

 

Gassore

GASS-17-022

53.40

54.65

1.25

2.29

 

Gassore

GASS-17-023

50.20

54.05

3.85

7.34

Including 1.60 m @ 15.45 g/t

Gassore

GASS-17-023

89.30

90.80

1.50

1.00

 

Gassore

GASS-17-024

49.70

54.05

4.35

2.99

 

Gassore

GASS-17-024

78.55

79.55

1.00

1.41

 

Gassore

GASS-17-024

94.75

95.45

0.70

7.68

 

Gassore

GASS-17-025

43.20

44.60

1.40

3.20

 

Gassore

GASS-17-025

74.70

75.80

1.10

17.45

 

Gassore

GASS-17-026

44.80

46.10

1.30

13.50

 

Gassore

GASS-17-026

74.55

76.00

1.45

1.38

 

Gassore

GASS-17-028

45.25

47.40

2.15

3.65

 

Gassore

GASS-17-028

82.65

84.00

1.35

4.59

 

Gassore

GASS-17-028

106.45

109.40

2.95

3.27

 

Gassore

GASS-17-029

90.00

91.40

1.40

1.13

 

Gassore

GASS-17-029

97.60

98.60

1.00

2.78

 

Gassore

GASS-17-029

151.35

152.30

0.95

1.44

 

Gassore

GASS-17-030

83.60

84.50

0.90

2.31

 

Gassore

GASS-17-030

108.60

109.50

0.90

13.55

 

Gassore

GASS-17-030

123.70

124.20

0.50

2.85

 

Gassore

GASS-17-031

64.65

65.75

1.10

2.62

 

Gassore

GASS-17-031

102.60

103.15

0.55

27.60

 

Gassore

GASS-17-032

60.50

65.00

4.50

1.17

 

Gassore

GASS-17-032

167.75

168.60

0.85

7.82

 

Gassore

GASS-17-032

218.40

219.15

0.75

2.91

 

Gassore

GASS-17-033

54.15

55.35

1.20

2.13

 

Gassore

GASS-17-034

54.05

54.90

0.85

1.55

 

Gassore

GASS-17-034

72.10

77.10

5.00

1.49

 

Gassore

GASS-17-034

129.85

131.00

1.15

1.14

 

Gassore

GASS-17-034

165.10

166.50

1.40

1.44

 

Gassore

GASS-17-035

39.65

40.45

0.80

57.80

 

Gassore

GASS-17-035

142.20

142.90

0.70

2.63

 

Gassore

GASS-17-036

0.80

1.50

0.70

4.01

 

Gassore

GASS-17-036

21.90

25.50

3.60

9.74

Including 1.5 m @ 20.4 g/t

Gassore

GASS-17-036

94.25

95.00

0.75

1.61

 

Gassore

GASS-17-037

38.50

39.50

1.00

1.33

 

Gassore

GASS-17-037

103.45

103.95

0.50

5.85

 

Gassore

GASS-17-038

63.00

63.85

0.85

2.16

 

Gassore

GASS-17-038

89.20

91.05

1.85

2.56

 

Gassore

GASS-17-039

24.00

26.45

2.45

1.69

 

Gassore

GASS-17-039

46.75

47.50

0.75

1.62

 

Gassore

GASS-17-039

55.85

56.85

1.00

1.69

 

Gassore

GASS-17-039

114.80

115.45

0.65

25.70

 

Gassore

GASS-17-039

178.50

179.00

0.50

8.48

 

Gassore

GASS-17-039

220.20

221.00

0.80

4.48

 

Gassore

GASS-17-040

22.15

22.90

0.75

27.20

 

Gassore

GASS-17-040

38.75

39.90

1.15

1.72

 

Gassore

GASS-17-040

78.95

80.40

1.45

59.00

 

Gassore

GASS-17-040

95.95

97.55

1.60

18.00

 

Gassore

GASS-17-041

48.50

49.55

1.05

3.47

 

Gassore

GASS-17-042

54.85

56.10

1.25

20.60

 

Gassore

GASS-17-042

68.40

69.10

0.70

1.01

 

Gassore

GASS-17-042

123.10

124.00

0.90

72.90

 

Gassore

GASS-17-042

170.70

171.15

0.45

20.10

 

Gassore

GASS-17-043

40.00

40.95

0.95

3.02

 

Gassore

GASS-17-043

50.90

52.00

1.10

2.65

 

Gassore

GASS-17-044

15.80

16.80

1.00

2.32

 

Gassore

GASS-17-044

48.00

49.50

1.50

1.77

 

Gassore

GASS-17-044

82.40

83.60

1.20

11.70

 

Gassore

GASS-17-044

129.50

130.20

0.70

2.78

 

Gassore

GASS-17-044

164.00

165.10

1.10

3.24

 

Gassore

GASS-17-045

95.05

96.10

1.05

21.30

 

Gassore

GASS-17-045

114.10

114.80

0.70

2.20

 

Gassore

GASS-17-046

22.40

25.80

3.40

4.30

Including 1 m @ 8.86 g/t

Gassore

GASS-17-047

80.55

83.30

2.75

7.99

 

Gassore

GASS-17-047

132.00

133.50

1.50

1.81

 

Gassore

GASS-17-048

25.05

27.05

2.00

7.76

Including 1 m @ 14.45 g/t

Gassore

GASS-17-049

33.20

34.25

1.05

1.42

 

Gassore

GASS-17-050

29.25

29.75

0.50

8.18

 

Gassore

GASS-17-051

23.60

24.25

0.65

40.80

 

Gassore

GASS-17-052

27.55

28.35

0.80

3.26

 

Gassore

GASS-17-052

98.75

99.60

0.85

25.30

 

Gassore

GASS-17-053

16.60

18.20

1.60

1.34

 

Gassore

GASS-17-053

19.20

20.30

1.10

1.31

 

Gassore

GASS-17-053

103.10

103.75

0.65

2.25

 

Gassore

GASS-17-053

142.25

143.10

0.85

1.02

 

Gassore

GASS-17-054

25.40

29.70

4.30

2.93

 

Gassore

GASS-17-054

50.15

51.05

0.90

8.06

 

Gassore

GASS-17-054

74.45

75.60

1.15

1.46

 

Gassore

GASS-17-054

103.28

104.90

1.62

1.13

 

Gassore

GASS-17-055

40.15

41.20

1.05

1.38

 

Gassore

GASS-17-055

85.35

85.85

0.50

26.10

 

Gassore

GASS-17-055

122.20

123.10

0.90

1.94

 

Gassore

GASS-17-055

146.85

147.65

0.80

1.33

 

Gassore

GASS-17-055

153.85

154.55

0.70

1.95

 

Gassore

GASS-17-056

13.85

15.65

1.80

1.97

 

Gassore

GASS-17-056

51.85

52.60

0.75

1.02

 

Gassore

GASS-17-056

61.10

61.60

0.50

3.79

 

Gassore

GASS-17-056

90.85

91.55

0.70

16.10

 

Gassore

GASS-17-057

59.55

60.10

0.55

15.30

 

Gassore

GASS-17-058

20.95

22.00

1.05

3.27

 

Gassore

GASS-17-058

47.35

48.70

1.35

2.47

 

Gassore

GASS-17-058

76.00

76.90

0.90

2.09

 

Gassore

GASS-17-058

91.50

92.65

1.15

2.00

 

Gassore

GASS-17-059

59.15

60.00

0.85

1.80

 

Gassore

GASS-17-059

100.30

101.60

1.30

2.10

 

Gassore

GASS-17-060

24.90

25.80

0.90

1.40

 

Gassore

GASS-17-060

62.80

63.50

0.70

8.85

 

Gassore

GASS-17-060

100.40

102.10

1.70

38.58

Including 0.80 m @ 76.4 g/t

Gassore

GASS-17-061

88.00

88.65

0.65

2.50

 

Gassore

GASS-17-061

103.00

103.85

0.85

1.09

 

Gassore

GASS-17-061

126.05

127.90

1.85

14.56

 

Gassore

GASS-17-061

161.60

163.05

1.45

18.15

 

Gassore

GASS-17-062

73.20

74.60

1.40

44.00

 

Gassore

GASS-17-062

113.90

114.90

1.00

30.00

 

Gassore

GASS-17-063

130.20

131.00

0.80

3.24

 

Gassore

GASS-17-063

180.10

181.00

0.90

1.97

 

Gassore

GASS-17-064

20.30

24.55

4.25

2.45

 

Gassore

GASS-17-065

46.60

49.45

2.85

2.05

 

Gassore

GASS-17-066

74.60

78.20

3.60

2.41

 

Gassore

GASS-17-067

95.75

100.50

4.75

14.74

Including 1.75 m @ 26.88 g/t

Gassore

GASS-17-068

34.55

35.70

1.15

1.91

 

Gassore

GASS-17-068

84.10

85.35

1.25

4.08

 

Gassore

GASS-17-068

124.70

129.30

4.60

11.11

 

Gassore

GASS-17-068

176.90

177.70

0.80

1.43

 

Gassore

GASS-17-069

25.80

27.90

2.10

18.23

 

Gassore

GASS-17-070

53.20

56.85

3.65

15.02

Including 0.90 m @ 50.4 g/t

Gassore

GASS-17-071

30.00

31.15

1.15

5.97

 

Gassore

GASS-17-071

83.30

84.95

1.65

14.16

Including 0.75 m @ 25.1 g/t

Gassore

GASS-17-072

110.00

110.75

0.75

231.00

 

Gassore

GASS-17-072

159.00

159.50

0.50

9.75

 

Gassore

GASS-17-073

64.45

65.00

0.55

6.90

 

Gassore

GASS-17-073

86.80

87.75

0.95

5.48

 

Gassore

GASS-17-073

131.85

132.50

0.65

6.58

 

Gassore

GASS-17-074

45.85

48.00

2.15

18.31

Including 1.15 m @ 32.5 g/t

Gassore

GASS-17-075

40.15

41.15

1.00

11.10

 

Gassore

GASS-17-075

72.00

73.00

1.00

3.44

 

Gassore

GASS-17-076

10.65

11.80

1.15

2.17

 

Gassore

GASS-17-076

59.65

60.20

0.55

18.40

 

Gassore

GASS-17-076

105.90

106.65

0.75

1.79

 

Gassore

GASS-17-077

37.40

38.00

0.60

1.49

 

Gassore

GASS-17-077

60.00

61.00

1.00

4.08

 

Gassore

GASS-17-077

84.00

84.70

0.70

25.10

 

Gassore

GASS-17-077

129.45

130.20

0.75

1.81

 

Gassore

GASS-17-078

39.35

40.75

1.40

1.49

 

Gassore

GASS-17-078

104.20

105.10

0.90

40.60

 

Gassore

GASS-17-078

150.00

150.70

0.70

1.22

 

Gassore

GASS-17-079

24.75

25.70

0.95

2.78

 

Gassore

GASS-17-079

73.05

73.70

0.65

1.67

 

Gassore

GASS-17-079

120.50

121.05

0.55

3.41

 

Gassore

GASS-17-079

168.15

168.85

0.70

5.58

 

Gassore

GASS-17-080

17.00

17.70

0.70

1.85

 

Gassore

GASS-17-080

20.20

22.30

2.10

1.07

 

Gassore

GASS-17-080

55.40

56.00

0.60

3.32

 

Gassore

GASS-17-080

95.05

95.80

0.75

1.63

 

Gassore

GASS-17-081

60.40

61.55

1.15

24.00

 

Gassore

GASS-17-082

46.40

47.00

0.60

1.64

 

Gassore

GASS-17-082

84.45

85.35

0.90

28.60

 

Gassore

GASS-17-082

129.65

130.20

0.55

1.60

 

Gassore

GASS-17-083

26.95

28.00

1.05

1.23

 

Gassore

GASS-17-083

81.90

82.60

0.70

1.16

 

Gassore

GASS-17-083

124.40

125.00

0.60

1.91

 

Gassore

GASS-17-084

43.70

45.00

1.30

42.60

 

Gassore

GASS-17-084

77.00

78.30

1.30

1.15

 

Gassore

GASS-17-085

24.75

25.70

0.95

2.91

 

Gassore

GASS-17-085

68.00

68.85

0.85

41.20

 

Gassore

GASS-17-086

90.35

91.20

0.85

6.51

 

Gassore

GASS-17-087

32.70

33.65

0.95

1.86

 

Gassore

GASS-17-087

110.30

111.25

0.95

11.90

 

Gassore

GASS-17-088

68.80

69.60

0.80

1.31

 

Gassore

GASS-17-088

88.20

89.90

1.70

1.37

 

Gassore

GASS-17-089

3.50

4.30

0.80

9.31

 

Gassore

GASS-17-089

45.15

46.00

0.85

34.00

 

Gassore

GASS-17-090

27.70

28.20

0.50

9.62

 

Gassore

GASS-17-091

118.50

119.40

0.90

2.00

 

Gassore

GASS-17-092

21.90

22.70

0.80

2.12

 

Gassore

GASS-17-094

50.40

51.20

0.80

5.00

 

Gassore

GASS-17-094

92.50

93.50

1.00

2.23

 

Gassore

GASS-17-095

32.65

33.50

0.85

1.66

 

Gassore

GASS-17-095

68.00

68.50

0.50

1.70

 

Gassore

GASS-17-095

74.50

75.05

0.55

3.15

 

Gassore

GASS-17-095

109.80

110.70

0.90

13.05

 

Gassore

GASS-17-097

53.55

55.05

1.50

13.80

 

Gassore

GASS-17-097

129.75

130.30

0.55

27.10

 

Gassore

GASS-17-100

49.10

49.80

0.70

3.19

 

Gassore

GASS-17-100

76.65

77.45

0.80

1.73

 

Gassore

GASS-17-100

119.10

119.80

0.70

11.70

 

Gassore

GASS-17-101

74.30

77.50

3.20

2.36

 

Gassore

GASS-17-102

95.10

98.35

3.25

2.53

 

Gassore

GASS-17-102

146.80

147.65

0.85

39.10

 

Gassore

GASS-17-103

24.15

25.40

1.25

1.46

 

Gassore

GASS-17-103

78.90

79.65

0.75

2.86

 

Gassore

GASS-17-103

120.00

123.25

3.25

5.52

Including 0.95 m @ 11.75 g/t

Gassore

GASS-17-105

22.40

23.50

1.10

3.43

 

Gassore

GASS-17-105

48.85

49.60

0.75

20.70

 

Gassore

GASS-17-105

84.80

86.00

1.20

9.60

 

Gassore

GASS-17-106

9.00

11.40

2.40

8.54

 

Gassore

GASS-17-106

46.50

47.90

1.40

13.65

 

Gassore

GASS-17-107

38.60

39.40

0.80

3.32

 

Gassore

GASS-17-107

102.00

104.60

2.60

7.05

Including 1 m @ 16.15 g/t

Gassore

GASS-17-108R

69.59

70.40

0.81

5.89

 

Gassore

GASS-17-109

122.15

123.20

1.05

7.74

 

Gassore

GASS-17-110

60.00

60.65

0.65

11.30

 

Gassore

GASS-17-110

93.60

94.50

0.90

15.25

 

Gassore

GASS-17-111

2.40

4.70

2.30

1.15

 

Gassore

GASS-17-111

47.00

48.30

1.30

17.35

 

Gassore

GASS-17-111

57.00

57.90

0.90

5.02

 

Gassore

GASS-17-111

66.80

68.30

1.50

2.09

 

Gassore

GASS-17-111

92.40

93.00

0.60

17.40

 

Gassore

GASS-17-111

127.53

128.30

0.77

2.00

 

Gassore

GASS-17-112

47.00

48.50

1.50

5.48

 

Gassore

GASS-17-114

18.10

19.10

1.00

2.70

 

Gassore

GASS-17-114

42.50

43.10

0.60

1.22

 

Gassore

GASS-17-114

89.45

90.15

0.70

2.54

 

Gassore

GASS-17-114

148.80

149.40

0.60

1.27

 

Gassore

GASS-17-115

37.45

38.60

1.15

1.63

 

Gassore

GASS-17-115

50.70

51.30

0.60

1.32

 

Gassore

GASS-17-115

106.45

107.40

0.95

2.11

 

Gassore

GASS-17-115

150.85

152.20

1.35

1.05

 

Gassore

GASS-17-116

2.00

4.40

2.40

4.62

 

Gassore

GASS-17-116

44.45

45.70

1.25

3.36

 

Gassore

GASS-17-116

57.60

58.15

0.55

13.05

 

Gassore

GASS-17-116

124.65

125.45

0.80

13.70

 

Gassore

GASS-17-117

28.30

29.10

0.80

7.44

 

Gassore

GASS-17-118

49.90

51.30

1.40

4.63

 

Gassore

GASS-17-118

118.70

120.20

1.50

1.59

 

Gassore

GASS-17-120

93.50

96.00

2.50

3.37

 

Gassore

GASS-17-120

143.85

144.40

0.55

8.63

 

Gassore

GASS-17-121

114.20

117.90

3.70

2.97

 

Gassore

GASS-17-121

195.45

197.00

1.55

4.85

 

Gassore

GASS-17-122

40.80

41.50

0.70

9.29

 

Gassore

GASS-17-126

70.30

75.40

5.10

4.45

Including 0.90 m @ 21.7 g/t

Gassore

GASS-17-126

124.70

125.45

0.75

10.55

 

Gassore

GASS-17-127

146.00

146.90

0.90

4.51

 

Gassore

GASS-17-128

119.80

120.60

0.80

2.08

 

Gassore

GASS-17-129

39.30

40.10

0.80

1.76

 

Gassore

GASS-17-129

62.00

62.50

0.50

1.71

 

Gassore

GASS-17-129

89.45

90.50

1.05

1.70

 

Gassore

GASS-17-130

26.85

27.90

1.05

3.26

 

Gassore

GASS-17-130

95.50

96.30

0.80

1.49

 

Gassore

GASS-17-131

113.30

114.55

1.25

8.89

 

Gassore

GASS-17-132

68.00

68.75

0.75

2.21

 

Gassore

GASS-17-132

108.20

109.20

1.00

1.49

 

Gassore

GASS-17-132

131.40

132.10

0.70

1.38

 

Gassore

GASS-17-133

38.35

39.50

1.15

3.10

 

Gassore

GASS-17-133

90.45

93.50

3.05

3.39

 

Gassore

GASS-17-134

17.15

18.20

1.05

1.06

 

Gassore

GASS-17-134

114.80

119.20

4.40

1.78

 

Gassore

GASS-17-134

166.60

167.80

1.20

8.43

 

Gassore

GASS-17-136

21.00

23.50

2.50

1.60

 

Gassore

GASS-17-136

90.40

91.20

0.80

8.32

 

Gassore

GASS-17-137

79.30

79.85

0.55

2.63

 

West Pit 4

WP4-17-012

4.70

6.05

1.35

2.10

 

West Pit 4

WP4-17-012

68.50

75.00

6.50

1.28

 

West Pit 4

WP4-17-012

82.00

83.74

1.74

2.21

 

West Pit 4

WP4-17-012

86.50

87.20

0.70

1.29

 

West Pit 4

WP4-17-012

97.85

98.30

0.45

2.95

 

West Pit 4

WP4-17-012

113.40

132.10

18.70

1.98

 

West Pit 4

WP4-17-013

40.50

42.40

1.90

3.01

 

West Pit 4

WP4-17-013

51.00

55.00

4.00

1.77

 

West Pit 4

WP4-17-013

61.40

62.40

1.00

1.02

 

West Pit 4

WP4-17-014

33.58

34.00

0.42

14.50

 

West Pit 4

WP4-17-014

39.70

41.00

1.30

1.12

 

West Pit 4

WP4-17-014

42.00

43.00

1.00

1.01

 

West Pit 4

WP4-17-014

64.50

74.50

10.00

2.91

 

West Pit 4

WP4-17-015

74.30

74.60

0.30

1.49

 

West Pit 4

WP4-17-015

74.30

91.80

17.50

1.72

 

West Pit 4

WP4-17-016

43.00

44.00

1.00

1.11

 

West Pit 4

WP4-17-016

44.35

46.15

1.80

1.24

 

West Pit 4

WP4-17-016

53.00

61.90

8.90

1.47

 

West Pit 4

WP4-17-016

65.00

66.00

1.00

1.39

 

West Pit 4

WP4-17-017

24.15

41.30

17.15

1.54

Including 0.70 m @ 9.07 g/t

West Pit 4

WP4-17-018

16.90

18.30

1.40

1.25

 

West Pit 4

WP4-17-018

20.30

21.75

1.45

1.41

 

West Pit 4

WP4-17-018

25.50

31.80

6.30

2.78

 

West Pit 4

WP4-17-019

50.00

51.10

1.10

1.29

 

West Pit 4

WP4-17-019

63.50

67.80

4.30

1.10

 

West Pit 4

WP4-17-019

74.90

76.40

1.50

1.20

 

West Pit 4

WP4-17-019

80.00

83.70

3.70

1.94

 

West Pit 4

WP4-17-020

55.00

56.00

1.00

1.32

 

West Pit 4

WP4-17-020

68.00

68.50

0.50

1.66

 

West Pit 4

WP4-17-021

21.80

22.80

1.00

1.26

 

West Pit 4

WP4-17-021

26.10

29.20

3.10

1.96

 

West Pit 4

WP4-17-021

39.50

43.50

4.00

1.11

 

West Pit 4

WP4-17-022

43.50

44.60

1.10

1.39

 

West Pit 4

WP4-17-023

21.25

22.15

0.90

1.15

 

West Pit 4

WP4-17-024

21.30

33.50

12.20

2.08

 

West Pit 4

WP4-17-024

62.50

63.00

0.50

1.05

 

West Pit 4

WP4-17-025

0.00

3.05

3.05

1.81

 

West Pit 4

WP4-17-025

32.30

32.80

0.50

1.10

 

West Pit 4

WP4-17-025

39.00

39.85

0.85

2.34

 

West Pit 4

WP4-17-026

20.15

22.20

2.05

2.58

 

West Pit 4

WP4-17-026

33.50

34.85

1.35

1.92

 

West Pit 4

WP4-17-028

36.70

37.70

1.00

1.62

 

West Pit 4

WP4-17-028

41.10

43.15

2.05

1.31

 

West Pit 4

WP4-17-028

47.25

48.10

0.85

1.39

 

West Pit 4

WP4-17-030

11.00

11.60

0.60

1.53

 

West Pit 4

WP4-17-030

47.00

48.80

1.80

2.39

 

West Pit 4

WP4-17-030

53.60

54.10

0.50

1.75

 

West Pit 4

WP4-17-031

63.25

71.90

8.65

2.08

 

West Pit 4

WP4-17-032

3.80

4.70

0.90

1.22

 

West Pit 4

WP4-17-035

9.10

21.70

12.60

1.12

 

West Pit 4

WP4-17-036

9.90

10.90

1.00

2.50

 

West Pit 4

WP4-17-036

32.00

33.10

1.10

1.65

 

West Pit 4

WP4-17-036

56.30

56.85

0.55

1.99

 

West Pit 4

WP4-17-040

22.50

23.45

0.95

1.32

 

West Pit 4

WP4-17-041

11.10

12.45

1.35

3.75

 

West Pit 4

WP4-17-041

26.15

28.50

2.35

5.66

Including 0.85 m @ 11.65 g/t

West Pit 4

WP4-17-041

40.10

41.35

1.25

1.52

 

West Pit 4

WP4-17-045

12.60

16.20

3.60

1.22

 

West Pit 4

WP4-17-045

93.60

94.40

0.80

1.82

 

West Pit 4

WP4-17-037

52.65

53.40

0.75

1.50

 

West Pit 4

WP4-17-038

69.35

70.15

0.80

1.33

 

West Pit 4

WP4-17-039

2.80

3.70

0.90

2.83

 

West Pit 4

WP4-17-044

69.75

70.30

0.55

1.77

 

West Pit 4

WP4-17-046

37.20

39.55

2.35

2.85

 

West Pit 4

WP4-17-046

47.70

49.00

1.30

1.61

 

West Pit 4

WP4-17-048R

44.90

45.55

0.65

5.78

 

West Pit 4

WP4-17-048R

54.55

55.60

1.05

1.25

 

West Pit 4

WP4-17-049

37.80

38.95

1.15

1.18

 

West Pit 4

WP4-17-049

53.00

55.60

2.60

2.04

 

West Pit 4

WP4-17-051

16.00

16.65

0.65

1.27

 

West Pit 4

WP4-17-052

15.60

16.20

0.60

1.01

 

West Pit 4

WP4-17-053

49.15

50.40

1.25

1.49

 

West Pit 4

WP4-17-053

72.60

75.20

2.60

1.21

 

West Pit 4

WP4-17-054

106.00

106.50

0.50

1.88

 

West Pit 4

WP4-17-055

132.50

133.30

0.80

2.42

 

West Pit 3

WP3E-17-001

26.60

27.60

1.00

1.16

 

West Pit 3

WP3E-17-001

47.40

48.00

0.60

2.94

 

West Pit 3

WP3E-17-002

4.20

5.60

1.40

2.06

 

West Pit 3

WP3E-17-002

18.85

19.40

0.55

1.02

 

West Pit 3

WP3E-17-002

27.70

30.10

2.40

1.43

 

West Pit 3

WP3E-17-004R

12.70

24.30

11.60

2.72

 

West Pit 3

WP3E-17-004R

60.70

61.30

0.60

2.31

 

West Pit 3

WP3E-17-005

10.00

11.00

1.00

1.18

 

West Pit 3

WP3E-17-005

31.70

33.00

1.30

2.12

 

West Pit 3

WP3E-17-005

47.00

48.05

1.05

2.68

 

West Pit 3

WP3E-17-006

19.15

20.05

0.90

2.96

 

West Pit 3

WP3E-17-006

31.50

32.00

0.50

1.57

 

West Pit 3

WP3E-17-006

35.30

37.50

2.20

1.87

 

West Pit 3

WP3E-17-007

3.45

4.80

1.35

1.66

 

West Pit 3

WP3E-17-007

15.65

26.85

11.20

2.15

 

West Pit 3

WP3E-17-007

30.80

33.00

2.20

3.85

 

West Pit 3

WP3E-17-008

17.15

18.15

1.00

1.68

 

West Pit 3

WP3E-17-008

28.60

29.30

0.70

1.04

 

West Pit 3

WP3E-17-008

32.75

33.55

0.80

4.04

 

West Pit 3

WP3E-17-009

10.25

10.80

0.55

1.04

 

West Pit 3

WP3E-17-009

13.30

14.00

0.70

4.60

 

West Pit 3

WP3E-17-009

36.40

37.00

0.60

4.04

 

West Pit 3

WP3E-17-009

54.00

55.30

1.30

1.05

 

West Pit 3

WP3E-17-0011

27.80

29.55

1.75

2.49

 

West Pit 3

WP3E-17-0011

54.60

56.05

1.45

4.27

 

West Pit 3

WP3E-17-0012

13.50

14.50

1.00

1.85

 

West Pit 3

WP3E-17-0014

20.30

25.10

4.80

1.78

 

Balogo

BDH199R

236.40

237.40

1.00

3.31

 

Balogo

BDH199R

246.55

249.20

2.65

3.58

 

Balogo

BDH200R

99.45

100.80

1.35

4.88

 

Balogo

BDH200R

213.00

214.00

1.00

1.40

 

Balogo

BDH201

54.40

55.40

1.00

1.42

 

Balogo

BDH201

69.35

75.50

6.15

1.87

 

Balogo

BDH202

104.40

105.30

0.90

1.71

 

Balogo

BDH202

107.35

107.85

0.50

2.01

 

Balogo

BDH207

31.80

34.75

2.95

2.56

 

Balogo

BDH207

47.90

52.55

4.65

8.96

Including  3.00 m @ 12.49
g/t  and 1.00 m @ 23.20 g/t

Balogo

BDH208

31.20

36.30

5.10

28.11

Including  2.00 m @ 68.70 g/t

Balogo

BDH208

100.75

102.20

1.45

5.91

 

Balogo

BDH210

65.75

66.25

0.50

1.18

 

Balogo

BDH210

104.50

110.20

5.70

4.59

Including  2.10 m @ 9.93 g/t

Balogo

BDH213

135.80

138.50

2.70

1.09

 

Balogo

BDH213

242.85

243.85

1.00

1.21

 

Balogo

BDH213

257.75

259.00

1.25

12.32

Including  0.65 m @ 18.55 g/t

Balogo

BDH213

261.95

263.50

1.55

2.73

 

Balogo

BDH213

269.00

269.60

0.60

1.20

 

Balogo

BDH214

82.60

83.40

0.80

1.55

 

Balogo

BDH214

95.85

96.90

1.05

2.09

 

Balogo

BDH214

100.10

100.85

0.75

1.18

 

Balogo

BDH217

32.00

33.05

1.05

1.05

 

Balogo

BDH221

125.65

129.05

3.40

21.16

 

Balogo

BDH223

160.35

161.35

1.00

6.58

 

Balogo

BDH223

278.60

279.25

0.65

1.01

 

Balogo

BDH224

57.65

60.60

2.95

1.38

 

Balogo

BDH225

51.25

52.30

1.05

1.05

 

Balogo

BDH225

56.95

58.00

1.05

1.05

 

Balogo

BDH226

57.65

58.70

1.05

1.05

 

Balogo

BDH228

186.45

187.50

1.05

1.05

 

Balogo

BDH229

31.25

32.30

1.05

1.05

 

Balogo

BDH232

7.95

18.80

10.85

2.21

 

Balogo

BDH237

54.80

56.40

1.60

3.24

 

Balogo

BDH241

54.05

59.50

5.45

22.20

Including  2.50 m @ 44.84 g/t

Balogo

BDH242

118.75

119.25

0.50

6.71

 

Balogo

BDH243

57.50

58.35

0.85

6.95

 

Balogo

BDH252

124.60

125.75

1.15

5.37

 

Balogo

BDH252

129.55

133.55

4.00

12.12

Including  1.35 m @ 31.50 g/t

Balogo

BDH252

143.15

143.80

0.65

1.90

 

Balogo

BDH252

167.00

167.80

0.80

4.02

 

* Drilled widths; it is estimated that true width will vary depending on the deposit. Approximate true widths are detailed below:
Balogo (82%), Panga (71%), Cobra Hill (82%), Balogo Hill (82%), A2NE (91%), WP3 (69%) & WP4 (87%)
A full set of drill results will be made available on our website at www.Avesoro.com

GET DAILY NEWS FLOW

Sign Up To Receive All Morning
News To Your Email Inbox

Please review our Disclaimer and Privacy Policy before subscribing.

FREEPORT RESOURCES (TSX.V: FRI)

Freeport Resources

Freeport Resources is advancing one of the largest undeveloped copper deposits in the world. The 100% owned Yandera copper project covers approximately 245 square kilometers and is located in the highly prolific Papua New Guinea Orogenic... LEARN MORE