Date: Thursday, Nov 18, 2021 @ 4:00 pm ET
Event: Featured
  • Project:  ​​​​​​​
    ​​​​​​​
    The 16,400 Ha Golden Sidewalk Project is located 60 km east of Red Lake, Ontario. The Project straddles 12 kms of the Balmer Assemblage - Narrow Lake Assemblage unconformity; ​​a crustal-scale fault structure similar to the predominant controlling structure in Red Lake.

  • ​​​​​​​Target:​​​​​​​
    ​​​​​​​
    The Golden Corridor, a 7 km+ till anomaly highlighted by numerous high tenor samples containing up to 2,858 pristine gold grains and containing up to 110.8 g/t Au.​​​​​​​

  • ​​​​​​​Current Work:​​​​​​​
    ​​​​​​​
    Recently commenced Phase II diamond drilling focussing on infill drilling at 1,000 m x 150 m gold mineralized system identified in Phase 1 drilling.

  • Capital Structure:
    ​​​​​​​​​​​​​​
    23.2M shares issued & outstanding, $3.8M in treasury.